• There seems to be an up tick in Political commentary in recent months. Those of us who are long time members of the site we know that Political and Religious content has been banned for years. Nothing has changed. Please leave all political and religiours commentary out of the fourms.

    If you recently joined the forums you were not presented with this restriction in the terms of service. This was due to a conversion error when we went from vBulletin to Xenforo. We have updated our terms of service to reflect these corrections.

    Please note any post refering to a politicion will be considered political even if it is intended to be humor. Our experience is these topics have a way of dividing the forums and causing deep resentment amoung members. It is a poison to the community. We apprciate compliance with the rules.

    The Staff of SOH

  • Server side Maintenance is done. We still have an update to the forum software to run but that one will have to wait for a better time.

A Question of Time

Wing_Z

Charter Member 2011
Not having any modelling experience in the sim, and maybe scoring a 4 out of possible 10 in plastic, I wondered which would take more time:
Modelling say a 1/48th scratch-build 10/10 plane for the bookshelf, or a state-of-the-art FS9 model of same?
 
Interesting question as I never looked at it this way.

I think a state of the art model of a FS9 model will take more time. There are a few very productive modelmakers, but most project I have been involved in took a year from start until finish.

Cheers,
Huub
 
I am sure it depends on how adept the model designer is for FS9. Ito-San can really put them out, I sure could never keep his pace with my plastic modeling. Nor could I keep Piglet's pace. I don't care what sim I fly in, FS9, GW3, or FSX, I always wind up flying one of Piglet's planes.

I have built a complete plastic model in less than one week (6 days), but one has to stay at it with the extremes in which i build. Most models take three weeks to a month for me to complete. I do primarily 1/72, but 1/48 WW I fighters are a fave.

Caz
 
The Epic LT took me about a year. I mapped and remapped ever square inch of that thing, did the airfiles over and over and over, made the textures a easy to repaint system with layers, then create a group of repaints for the main package. Not to mention the soundpack.

So, a high detail 3D virtual model will probably take you much longer then creating a actual scaled 'model' of a plane, but thats for a high detail plane. There are ways to quickly whip out a mesh model, use existing gauges, sounds, basic textures, etc. Kazunori Ito is a good example of a lightning fast modellor who has developed some good shortcut techniques that work well for him.


Bill
 
Well Cazzie, from someone with your experience and expertise, that's a good assessment of the plastic side. Now, from the fingers of one of the FS masters...
"This is a new WIP of just 16 days, nearly full time at it, so lots to do yet. The question is can we beat the Easter bunny, 3 months." Milton Shupe
http://www.sim-outhouse.com/sohforums/showthread.php?t=6820

The probable reality is: "It takes as long as it takes." Or, as the sign where I used to work said: "Good work takes time - perfection takes a bit longer"

Rob
 
Speaking as a Plastic Modeller and a Flight Simmer...

I don't do much scratchbuilding but, taking my time, for $50-150(CAN) I can slap an acceptable 1/48 plastic model together in 1-4 weeks...only to sit on a shelf collecting dust because they really don't fly well and generally, I can only crash them once.

FS9 models on the other hand, may take many months of spare time to design and build...but they cost less, fly better and I haven't smashed one beyond repair yet!
 
Back
Top